Iron Ore, Coal Loading and Shifting work by VMMPL

3 comments:

  1. Central government project (2020)
    Coal Mine Heavy Vehicles Project

    No -1 : Total vehicles number - minimum:-25, maximum:-600)

    No-2 : Per Heavy vehicles load limits - 26 tone,

    No-3 : Per vehicle kilometre in one trip up and down total 14 km,(26 tone)

    No -4 : (55 rupees) per ton will be paid for carrying goods,- (26*55=1430) per vehicles in one trip cost,

    No- 5 : This is the number of trips each day = 8 trip per vehicles,(8*1430=11440) in one vehicle payment per day,

    *The total payment figures for one vehicle are explained below:-

    Per tone payment :- 55 vehicle load capacity:- 26 *per
    ---------
    1430

    The vehicle will get a total payment for 8 trips every day 1430*8= 11440

    **** Will receive a total payment of 50 vehicles each day 50*11440 = 5,72,000 (5 lacs 72 thousand rupees).

    Conclusion:- In my opinion this is a very good project. This is a great deal.